Thank You for all and any ideas you can share, they are all welcome and appreciated. * This created a cable that is really not a "required" cable because it actually comes attached to the load cell.ġ) How do we omitt this cable from the Cable Report?Ģ) Is there a better way to do what we are trying to do? I think this makes the load cell schematic look more realistic as opposed to showing all wire connections on the Load Cell Symbols. AutoCAD Electrical User and IT Hardware Support. Im not sure which standard they are from but its a start. This way we can show the wire colors and numbers on this end. A quick google search for Schematic symbols for Optical Fibre Ports brought up these along with a host of links. After symbol is placed we connect one cable to the right side of the symbol to represent the attached cable, run the cable to its destination and then FAN-OUT to make connections to the Scale Controller. Now we have one connection point on the right side of the symbol. I am thinking of making a 4-Wire and 6-Wire Symbol, showing the bridge and wire connections inside a box, running the wires together to one point on the right side of the box, like the Fan-In Function. Load Cells come with a length of cable attached, so we don't need it in the cable report.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |